Location:
Fort Wayne, IN
Location:
Fort Wayne, IN
Delivery Method:
Design-Build
Self-Performed Concrete
Project:
Size:
Construction Cost:
Designer:
Completion:
TWE Nonwovens (formerly Vita Nonwovens) is a production facility providing thermo-bonding, needling, lamination, and die-cut capabilities. Hagerman constructed this 150,000 square foot pre-engineered metal building (PEMB) expansion of an existing manufacturing facility. The expansion added five new docks and infrastructure for production equipment. The project delivery was design-build with a lump sum.
Serving the community since 2013, Vita Nonwovens hired Hagerman in 2013 and 2018 for expansions to their facility.
© 2024 The Hagerman Group | Hagerman Sharepoint |